cost chart

英 [kɒst tʃɑːt] 美 [kɔːst tʃɑːrt]

成本图表

经济



双语例句

  1. The approved indirect cost rates applicable to all proposed projects are shown in Indirect Cost Rates chart.
    适用于所有研究方案的间接成本率,都显示在了间接成本率图表上。
  2. The major influence factors and control methods of cost differences are discussed by Pareto chart method.
    探讨利用排列图寻求成本偏差的主要影响因素,并对主要因素的影响进行控制的方法。
  3. So far, this effort has failed: the cost of borrowing has risen, not fallen ( see chart).
    迄今为止这种努力未能取得成功:借贷成本已经上升,而没有下降(见图表)。
  4. To enter a total cost for a resource assignment that does not require work but you want to keep the duration unchanged, on the view menu, click Gantt chart.
    若要为不需要工时的资源分配输入总的成本值,请在“视图”菜单上,单击“甘特图”。
  5. And you can display cost fields next to bars in the Gantt chart by formatting the bars using bar styles from the format menu.
    也可以通过使用“格式”菜单上的“条形图样式”设置条形图的格式,以便在“甘特图”中的条形图旁显示成本域。
  6. Sometimes the fiscal cost has been over 40 per cent of GDP ( see chart).
    财政成本一度达到了gdp的40%以上(参见图表)。
  7. A Brief Introduction of the Cost Consultation of Communication Engineering and Its Basic Flow Chart
    浅谈通信工程造价咨询的管理与基本流程
  8. As a result, the cost of borrowing for companies with stronger finances, and even for those with junk bond ratings, has generally been flat or even falling over the past month, irrespective of the turmoil ( see chart).
    其结果是,过去一个月里,尽管市场处于动荡状况,但对于财力更强的企业甚至那些债券为垃圾级的企业来说,举债成本总体保持不变,甚至还有所下降。
  9. When I showed them my cost benefit analysis chart.
    当我展示我的成本收益分析表时。
  10. But in the end he achieved few cost savings, while adding a staggering$ 8 trillion to Medicare's unfunded liability ( see chart).
    然而最终他没能节省医疗成本,而美国医疗保险系统未偿清的债务中又加上了一个令人咋舌的数字:8万亿美元。
  11. According to changes of stimulation cost, oper ation varied cost and oil price, the chart related to the stimulation economical limitation and oil price, stimulation cost, operation varied cost is developed.
    通过研究措施费用、措施变动成本和油价的变化,建立了措施增油经济界限与油价、措施费用、措施变动成本的关系图版。
  12. This paper describes programming method that is used for the program which computes the cost of power for the large electrical power users, and gives flow chart of program as well as data structure used.
    本文叙述用于大电力用电户的电费计算程序的编制方法,并给出程序流程图及所用的数据文件结构。
  13. A scheme is provided to construct a low cost tower control simulator based on 2D scene, a method to establish 2D scene simulation model and tower control simulation model is researched, and a principle chart to realize the simulation system is designed.
    提出了基于二维视景构建低成本空管塔台模拟系统的解决方案,重点研究了该模拟系统的视景建模方法和管制模型的建立,并设计了系统实现的原理框图。
  14. This paper mainly introduces the basic concepts of cost curve ( S curve) and target chart, improves the method of target chart, and gives a new method equivalence target chart to realize schedule cost combined control.
    在此基础上,着重介绍了成本曲线(S曲线)和靶心图的基本概念,并对靶心图进行了改进,采用等值靶心图方法实现联合控制。
  15. Cost of each node is stored in linked chart. The eventually closed chart is sequence of optimal nodes.
    每一节点处的代价采用链表open或closed进行存储,A算法中最后的closed链表存储的就是最优节点序列。
  16. It results in the schematics of the theoretical solar chemical pump system and the coal-fired heating system, as well as the cost comparison chart of two systems under the same conditions.
    结果给出太阳能化学热泵理论系统和燃煤供热系统原理图和在相同条件下供热时两种系统经济支出的对比图。
  17. In order to control the overall quality cost of the project, this paper has used the key factors of project quality cost to establish a control chart of the overall quality cost of the project, and conducted a controlling analysis on it.
    为了对项目的总质量成本进行控制,利用关键的项目质量成本因素,建立了项目总质量成本控制图,并进行了项目总质量成本的控制分析。
  18. Analyze the business requirement of the cost management information system. Drawn the flow chart of software based on the demand of the spiral model analysis method, providing a reliable basis for software production. 3.
    对建筑企业成本管理信息系统进行了业务需求分析,梳理流程,按照螺旋模型的需求分析方式,画出软件流程图,为软件制作提供现实可靠的依据。
  19. As to the study of application, this paper mainly discusses the method of Process Oriented Cost Control, analyzes its flow chart and key steps, and illustrates its application in order to prove its effectivity and feasibility.
    在应用研究方面,本文主要讨论了面向过程的成本控制,分析了其实施流程、实施要点,并结合案例对这一方法做了说明,以证明该方法在应用方面的有效性和可行性。
  20. In order to effectively carry out the control of project failure cost, this paper used the Pareto chart, cause and effect diagram, etc, to screen the key quality cost elements in different stages, and pick up corresponding key failure factors.
    为了有效地实施项目故障成本的控制,利用帕累托图、因果图等方法对项目不同阶段的关键质量成本要素进行筛选和甄别,确定了相应的关键故障因素。
  21. At the same time, this essay analysed the uptrend of the annual construction cost and drew comparison chart with reference to highway construction cost data in the three neighboring provinces ( i.e. Shanxi, Shandong and Henan).
    同时参照周边(晋、鲁、豫)三省的造价数据资料,分析并绘制年度造价上涨趋势对比图。
  22. At the same time the cost of the critical path both before and after duration-cost optimization are compared by the milestone plan, Gantt chart plan and network diagram after the optimization in accordance with the Magnum project management software program.
    并根据方案利用梦龙项目管理软件编制出优化后的里程碑计划、横道图计划和网络图计划,同时对优化前后关键路径的总费用进行了对比。
  23. This control method to make use the project schedule and cost synchronous is the bar chart which can be found clearly the potential question.
    这种利用工程进度与成本同步控制的方法一般采用横道图,可以清晰的发现项目可能存在的问题。